uni-semantic Phase 4: Emitter MVP (dbt · Cube)
Parent milestone ba31c9e8 — ROADMAP ## Phase 4 — 에코시스템 · MCP · slg 배포. tenant_cd N/A → Done = merge + local cargo test 증거.
Kickoff
- Eric Approval (
@pm 시작 해) → milestonewaiting_for_approval→in_progress. - First slice: Emitter
51c758f3→ lane developer; MCPd15d16f2/slg9abce257stay backlog until Emitter seals.
Emitter MVP (Intent pass · PR #16)
- Hub-only:
backends/dbt→ MetricFlow standalone YAML (semantic_models+metrics);backends/cube→ Cube YAML (cubes). - Min IR = Looker emitter:
table(+pk/fk),metricsum|count|avg(col), optionalviewjoins. No IR schema patch. - dbt: legacy MetricFlow YAML (not model-embedded) so one emit artifact ≠ dbt DAG requirement.
- Cube joins:
view(base=table) elsetable.fk; relationship fixedmany_to_one. - Non-goals on Emitter ticket: MCP,
slgpackaging, GUI Schema Diff. - Verify:
cargo test -p backend_dbt -p backend_cube(4 unit) + fullcargo testgreen; ROADMAP first Phase 4 checkbox[x].
pm-checkpoint silence (post-Emitter)
- FLOW often = milestone only in_progress; review/deploy/qa empty.
- Silence ≥30m × 3 empty →
waiting_for_approval+@eric.yoo(MCP/slgkickoff waits human). - Board-only / status-board upsert does not reset silence clock.
slg CLI (Intent pass · PR #17)
- Cargo bin crate
cli/package nameslg:convert --from pbip --to lookmlandschema-diff. - Hub-only:
frontend_powerbi::parse_bim→ IR →backend_looker::emit_lookml(no spoke↔spoke). --from pbipreads BIM JSON file or dir (model.bim/*.bim.json); full PBIP/TMDL still out of frontend scope.schema-diffcompares IRfingerprint(kind+name) only — CLI, no GUI.- Verify:
cargo test -p slg(5 passed); smoke convert emitsview: orders; fixture fingerprints can match on shared names. - ROADMAP Phase 4
slg[x]; no ARCHITECTURE/IR patch (§5 already). PR #17 mergedbb77ec2; ticket9abce257→ done.
MCP ticket cancelled (스키마 갭)
- Phase 4 MCP child
d15d16f2→ done(cancelled) — sql-mcp hierarchy/role_playing 갭으로 본구현 보류. - roadmap marker
<!-- roadmap:uni-semantic:ir-기반-mcp-연동-… -->already on cancelled ticket → sync dedupcreated=0. - Doc lag: 보드 cancelled vs ROADMAP open checkbox 가능 — invent/pass-gate 금지.
- role_playing strip 계약: Sql-Mcp-Hierarchy-Role-Playing.md
Phase 4 board closeout note
- Emitter + MCP(cancelled) + slg all sealed on board; milestone
ba31c9e8closeout는 별도(waiting_for_approval 유지·미강등 가능).
관련
- Phase 3 closeout: Uni-Semantic-Phase3-Dialect-and-Spokes.md
- Roadmap sync: Roadmap-Sync-Unchecked-H2-Gate.md
- Checkpoint ops: Factory-Schedule-Ops-Skips.md
- sql-mcp hierarchy/role_playing: Sql-Mcp-Hierarchy-Role-Playing.md